Team 4 Building our studio


This morning the team splintered into several groups, tasked with shopping for supplies and props, starting the construction on site, blogging, devising how to engage with the local community and continuing with ideas about the overall design of our intervention (more on this in the next post). As much as possible, we are using recycled materials - lots of preloved timber and quirky equipment from gyms, hospitals, etc.

Progress has been made with the construction of the base structure. Already we are occupying and generating activity on site - an important response to the brief. A bit of planning and some building ...


Mid-afternoon some of the team were unlucky enough to get stranded at the hardware store, as the rental car decided to lock them out, so to speak (no names mentioned :)). This 2 hour delay did affect the construction schedule, but we are still hoping to have the table and ramp built before we finish tonight.



By midnight, we were thankful to have our Table built!




Timelapse video of a day on site:

No comments:

Post a Comment